Flagship Architecture
The Centralised
Charging System.
One shared system powers every parking bay within your building’s sanctioned load — no upgrade to your electricity supply, no risk to the building.
Grid Core Simulation
The Multi-Tenant Tipping Point
Your building's supply was sized for homes, on the assumption that not everyone draws power at once. When unmanaged individual chargers all pull current at midnight, that assumption is completely broken.
The 15–20+ EV Trap: At just 15 to 20+ simultaneous un-orchestrated users, voltage drops and main breakers start tripping — and the community is looking at an unplanned supply upgrade it never budgeted for.
LOAD DEMAND · MIDNIGHT PEAKSTATUS: OVERLOAD
00:00 (START CYCLE)02:00 (PEAK DRAW)04:00 (STEADY FLOW)
Phased Implementation Blueprint
The EV Transformation Journey
Scale the system from early adoption through to full community density.
Phase 01
Enable & Educate
Put in the shared system and the first charge points, using the spare capacity the building already has.
Architectural Alignment: Why Centralised Wins
How fragmented individual chargers compare against one unified, managed system.
Swipe table →