Skip to content
NEVORAECOVOLT
RWA & Housing Societies

Turn infrastructure into an RWA asset.

Stop individual EV chargers from overloading your community's grid. A Centralised Charging System eliminates retrofit risk and turns charging into a managed community asset.

The hidden cost of "free" individual chargers

Your building's supply was sized on the assumption that not everyone draws power at once. Unmanaged EVs push past it and can force an emergency supply upgrade the society never budgeted for.

The Problem

Why individual chargers fail.

Managing EV charging at scale requires more than plugging in cables. Here is what goes wrong.

01

Safety Risks

Uncoordinated wiring leads to unsafe, non-standard installations and real fire-hazard risks across the building.

Infrastructure
02

Grid Instability

Everyone charging at once, with nothing managing it, trips the building and strains the supply.

Power Grid
03

Infrastructure Chaos

Random cabling, wall drilling, and ad-hoc setups create expensive visual disorder.

Installation
04

No Scalability

Individual setups can't share the supply — every new EV costs more.

Growth
05

Billing Disputes

Manual electricity tracking is inaccurate and unfair — leading to monthly disputes.

Operations
06

Future Constraints

Without centralised planning today, expanding the network later becomes technically prohibitive.

Future-Proofing
Swipe to explore
Our Solution

End-to-end infrastructure.

We don't just install chargers. We engineer a complete, managed EV ecosystem that grows seamlessly.

01

Shares the Supply

The system shares the supply across every charging point — no tripping, every car charged.

Power
02

Its Own Supply

Charging runs on its own supply, kept apart from the homes — clean, compliant, and safe by design.

Safety
03

Automated Smart Billing

Per-user energy tracking with app-based reporting. Residents pay exactly what they use. Zero manual reconciliation.

Billing
04

Zero Operational Burden

We manage the hardware. Servicing, repairs, and remote software updates are covered by the managed-service contract — no separate charge to the society, no committee callout.

Operations
05

Phase-Wise Scaling

Start small, grow smart. Infrastructure built to scale in planned phases as EV adoption rises.

Growth
06

Clean Installation

Tidy cable runs, minimal wall impact — designed to look as good as it performs.

Installation
Swipe to explore
How It Works

Live grid in 4 steps.

No technical knowledge needed on your end. We handle everything.

01

Free Site Visit

Our engineers evaluate your electrical capacity, parking layout, and EV demand — zero cost, zero obligation.

02

Infrastructure Engineering

A custom deployment plan with full technical architecture and cost estimate — delivered within 48 hours.

03

Smart Deployment

Charge points installed with dedicated electrical panels, fully compliant, with minimal disruption.

04

Managed Operation

24/7 monitoring, automated billing, and ongoing maintenance — we keep your infrastructure running safely.

Swipe to explore
Risk Factor Assessor

Does any of this apply to your building?

Six questions, none of them technical. How old the building is, how your area's supply behaves, how residents are charging today. You should not need to know your sanctioned load to find out whether you have a problem.

We read your answers against what we find in Bengaluru buildings of the same era and show you an indicative assessment on the spot — free, no obligation. Our team then gets in touch to talk it through.

Assess my building
Why Nevora

Built for communities.

Vertical specialists in residential EV infrastructure — no resellers, no middlemen.

01

Community-Focused Expertise

Vertical specialists with solutions designed for the unique technical and operational challenges of residential environments.

Expertise
02

Powered by Intelligent Software

CORE is designed to control charging, share the supply, watch the system around the clock, and do the billing. It is in active development.

Software
03

Flexible Financial Models

Deployment models designed to address local challenges and community capital needs.

Finance
04

Complete Lifecycle Management

From site assessment and design to installation, operations, and maintenance — we manage the entire lifecycle.

Lifecycle
05

A Supply of Its Own

Charging gets its own supply, separate from the homes — safe, and built to DISCOM rules.

Infrastructure
06

Scales With EV Adoption

The system grows as more residents buy EVs, without expensive rework.

Growth
Swipe to explore

Future-proof your community.

Book a free site visit. We'll assess your electrical capacity and prepare a proposal within 48 hours — obligation-free.